Traffic diverted via B. B. Borkar Road till Jan 2026 PWD has ordered closure of the left carriageway of NH-66 from O Coqueiro junction to Mall de Goa from August 24, 2025, to January 31, 2026. The shutdown is to facilitate construction of the six-lane elevated corridor. Traffic to Panaji will be diverted via B. B. Borkar Road, with designated access provided for local residents and establishments.
Categories
Civic Issues
Charming topic
——
https://the.hosting/fi/vps-vds-switzerland-geneva